Watch this video to see a pilot-scale gasification test campaign conducted at VTT’s Pilot Centre Bioruukki. The test campaign shows the process for optimizing the co-production of biochar and synthesis gas from woody residues.
FlexSNG News: Pilot tests campaign May 2023
Successful validation campaign: During the first pilot test campaign in May 2023, VTT’s newly constructed pressurized CFB gasification pilot plant “UCG2021” was successfully operated in